Sale

1M 2M 3M Fast Phone Charger Long Lead Charging Cable USB Type C Cable Micro USB Cables Type-C Charger USB C Cable

$1.08$2.75

SKU: 3256804977403021 Category:
Clear

Description

Product size: 1m/2m/3m
Available colors: black/red/blue/white
Product material: needle-through knitting
Product current: 2.4A
Copper wire specification: 55*0.08*2+10*0.08*2 bare copper far love terminal
Product advantages: environmentally friendly pure copper wire core, PVC wire, the wire is soft, durable, not easy to knot, delicate in hand, high-end texture, and solves the trouble of slow charging.
Package Including:1pcs Type-C Charger

Notice:
Since it is a manual measurement, please allow a slight deviation.
Due to the differences between different monitors, the picture may not reflect the actual color of the project.

Additional information

USB Type

USB2.0 Type-C

Use

Smart Devices

Brand Name

MIIQNUS

Origin

Mainland China

Certification

CE

Product size

1m/2m/3m

Available colors

black/red/blue/white

Product material

needle-through knitting

Product current

2.4A

Copper wire specific

55*0.08*2+10*0.08*2 bare copper far love terminal

has been added to your cart.
Checkout