1M 2M 3M Fast Phone Charger Long Lead Charging Cable USB Type C Cable Micro USB Cables Type-C Charger USB C Cable
$1.08 – $2.75
- Description
- Additional information
Description
Product size: 1m/2m/3m
Available colors: black/red/blue/white
Product material: needle-through knitting
Product current: 2.4A
Copper wire specification: 55*0.08*2+10*0.08*2 bare copper far love terminal
Product advantages: environmentally friendly pure copper wire core, PVC wire, the wire is soft, durable, not easy to knot, delicate in hand, high-end texture, and solves the trouble of slow charging.
Package Including:1pcs Type-C Charger
Notice:
Since it is a manual measurement, please allow a slight deviation.
Due to the differences between different monitors, the picture may not reflect the actual color of the project.












Additional information
| USB Type | USB2.0 Type-C |
|---|---|
| Use | Smart Devices |
| Brand Name | MIIQNUS |
| Origin | Mainland China |
| Certification | CE |
| Product size | 1m/2m/3m |
| Available colors | black/red/blue/white |
| Product material | needle-through knitting |
| Product current | 2.4A |
| Copper wire specific | 55*0.08*2+10*0.08*2 bare copper far love terminal |




























